MONTECARLO - SMA |
| |
| Restoration and cleaning of walls,
road surfaces and steps (painted with wall paint) stained by smog. |
| |
Job type
|
|
Result |
| PHOTO 1 –
road tunnel near port |
|
|
Rocky walls blackened by smog and time.
|
|
Very fast restoration of rock to original colour.
|
Road surface with inset fragments of mirror
dirtied by tyre marks from through-traffic.
|
|
Restoration of road surface with bleaching and
restoration to original state, but without making the mirror fragments
opaque. Cleaning completed very quickly.
|
| PHOTO 2 –
head offices of SMA |
|
|
Steel stake requiring paint stripping, steel base
with paint residue and rusty parts of a vehicle belonging to SMA.
|
|
Total removal of paint and rust. Results showed
trial to be highly effective.
|
| PHOTO 3 |
|
|
Wall painted with wall paint, dirty from exposure
to atmosphere.
|
|
Delicate yet effective cleaning with removal of
atmospheric dirt without damaging the wall paint.
|
| PHOTO 4 –
zone above port near Auto Museum |
|
|
Quite shiny hard stone staircase. General dirt,
atmospheric dirt and smog stain removal trial.
|
|
Effective and reasonably fast cleaning with
removal of atmospheric dirt by bleaching the substrate yet without
compromising the shininess.
|
| PHOTO 5 |
|
|
Grey cement base around the UNESCO garden.
Atmospheric dirt and smog stain cleaning trial.
|
|
Highly effective, very fast cleaning.
|
| PHOTO 6 -
zone above port near Auto Museum |
|
|
Hard white marble staircase. General dirt,
atmospheric dirt and smog stain removal trial.
|
|
Effective and reasonably fast cleaning with
RESULTS better than achieved with water sandblasting.
|
| PHOTO 7 -
“Grimaldi Forum” Congress Hall |
|
|
Marble wall made dirty by greenish copper residue
dripping from overlying copper roof: wall now almost totally green and
discoloured also by proximity to the sea. Substrate consists of hard
marble.
|
|
Highly efficient cleaning with total restoration
of the substrate.
|
| PHOTO 8 -
“Grimaldi Forum” Congress Hall |
|
|
Cement base around roof made dirty by greenish
copper residue dripping from overlying copper roof: now almost totally
green and discoloured also by proximity to the sea
|
|
Highly efficient cleaning with total restoration
of the substrate. This last trial was specifically requested by a
manager of the Grimaldi Forum.
|
| |
return to Case history
 |